Modernization and reconstruction of the facilities of the Oil and Gas Institute

<p><strong>Modernization and reconstruction of the facilities of the Oil and Gas Institute</strong></p>
Typology
Lab
Location
Cracow
Investor
Oil and Gas Institute - National Research Institute
Building area
-
Date of creation
2016

Preparation of multi-discipline documentation and cost estimates along with acting as an expert with expert advice in the field of maintaining current requirements for safe work, technologies for safe production and production of petrochemical products, their storage while maintaining conditions enabling research and experiments using toxic and fire-hazardous products. Preparation of explosion risk analyses, technical expertise – for the purpose of modernization and reconstruction in the facilities of the Oil and Gas Institute – National Research Institute in the Petroleum Technology Division in Krakow, Łukasiewicz st.. The project included adapting five buildings to occupational health and safety and fire safety regulations.

 

“Fraction warehouse” – Analysis of the explosion risk, expansion and renovation of the building of the technical and operational hall intended to secure semi-technical quantities of liquid hydrocarbons (several tens of thousands of liters) for the purposes of research and production, together with internal installations, and the use of solutions protecting against the impact of static electricity.

 

“Hall CD” building – explosion risk analysis, reconstruction of the general and technological mechanical ventilation installation – station exhausts with a detection system, reconstruction of the electrical installation.

 

“Sample Archive” building – reconstruction of the emergency mechanical ventilation installation based on the explosion risk analysis along with the detection system, reconstruction of electrical installations, application of solutions protecting against the impact of static electricity.

 

“Cavern station” – construction of emergency mechanical ventilation based on an analysis of the explosion risk with a detection system, reconstruction of electrical installations and renovation of the room with the use of solutions protecting against the impact of static electricity.

 

A project for the modernization of the fire-fighting and service water supply line to laboratory buildings and the technical infrastructure of the laboratories, with a separate fire-fighting water line due to the increased fire safety requirements of building “B” and the construction of an underground fire-fighting water tank.

Expand content

Reach out.

Contact us! Describe your case in detail and we will respond as quickly as possible.

    EnglishPoland